Skip to content

25th Street Plaza Photo

25th Street Plaza

Photo Gallery



Construction Images

  • A view of 25th Street with cars. (Oct. ’12)
    A view of 25th Street with cars. (Oct. ’12)
  • Baruch College President Mitchel B. Wallerstein receives green light to build the interim plaza. (Nov. ‘12)
    Baruch College President Mitchel B. Wallerstein receives green light to build the interim plaza. (Nov. ‘12)
  • Construction crews begin milling away the old street surface. (Dec. ’12)
    Construction crews begin milling away the old street surface. (Dec. ’12)
  • Crew members apply a new tack coat to the street before they resurface. (Dec. ’12)
    Crew members apply a new tack coat to the street before they resurface. (Dec. ’12)
  • Potted trees are added to the interim plaza. (Dec. ’12)
    Potted trees are added to the interim plaza. (Dec. ’12)
  • Large concrete boulders are also installed by landscapers. (Dec. ’12)
    Large concrete boulders are also installed by landscapers. (Dec. ’12)
  • The pedestrian plaza opens for Baruch and community members to enjoy. (Jan. ’13)
    The pedestrian plaza opens for Baruch and community members to enjoy. (Jan. ’13)
  • New Baruch-colored chairs and tables were placed on the plaza (Jan. ’13).
    New Baruch-colored chairs and tables were placed on the plaza (Jan. ’13).